GAS PETRO BULK, KENYA
Year: 2015
We have supplied all the equipment for the assembly of an edible oil storage facility in the Mombasa port. This is the biggest facility in Kenya that allows ships to discharge directly from their birth.
We supplied the following:
- Welding Rodes
- Steel Sheets
- Valves
- Radar Gauge
- Pipe & Fittings
- Mounting Flange
- Hand Held Calibrator
- Centrifugal Loading Pumps
We were successful in delivering material for the first phases in 6 weeks and completed all deliveries in 4 months. Our scope included testing all third party equipment, inspection, loading and shipping. Our greatest challenge was coordinating the shipping of over 50 containers and inspecting all the goods.